BLOG

Construction site example| The original state recovery and restoration work in a restaurant at Dougenzaka, Shibuya ward

At this time, we thank you very much for browsing『Kikuchi Souken Co.,Ltd.』home page.

We have been setting up our company office at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an『Interior decorative construction contractor(company)』taking charge of full set of 『Interior decorative construction』・『Original state recovery and restoration work』for you.

 

There are a lot of luxurious areas in Shibuya word, and the restaurant managements there are full of spirit.

However, the original state recovery and restoration work at the time of the end of property contract is an indispensable work operation.

 

This time, we are introducing and explaining a construction site example of the original state recovery and restoration at a certain restaurant in Shibuya ward.

 

 

 

What is the original state recovery and restoration work?

 

As to the original state recovery and restoration work, after leasing a rental property and/or a facility, it is a returning work of the building or the facility to the atate before moving in at the end of contract.

 

When ending the rental contract, the original state recovery and restoration is made to be compulsory generally.
By this, when doing the building maintenance and management for the next property renting shop or store moving and/or withdrawing, it is usually necessary to make the rented place to return to the original situation. The work is called as the original state recovery and restoration work.

 

The just original situation is, often pointed to be only the building body, and completely without the interior decoration・equipment and others.

 

According to the renting tenants, the using ways are greatly different.
So, the costs of the original state recovery and restoration work differ greatly.

 

The detail of the construction site example this time is as follows:

 

Construction kind:the original state recovery and restoration work

The construction site location:Dougenzaka, Shibuya ward, Tokyo

Construction period: about 3 weeks

Construction contents:We do decommission work of the interior decoration related, then go to return to the just rented situation.

 

We are introducing and explaining the procedure with the construction pictures.

 

Temporal surrounding work

In the first place, we install a temporal surrounding at the front of the shop.

We assemble and mount groundwork by LGS(=light gauge steel), stick on lauan plywood, and install an aluminum door.

 

LGS下地組

LGS groundwork

 

 

 

ラワン合板とアルミ扉を設置

Installing lauan plywood and aluminum door

 

 

Temporal surrounding (crime prevention fence) is installed for ensuring safety at the construction site and work area.

It defends trespass and robbery, and protects the surrounding from dangerous work operation.

Observing the legal requirements and concerning for the environment are also included.

It also performs as a visual sign, and indicates that the work is on the way.

 

 

 

Decommission work

 

We do decommission work of the existing ceiling and wall.

 

 

We strip the double sticked gypsum boards which were adhered on the existing wall.

After stripped, the previously constructed LGS and heat insulating material were seen.

 

 

After cleaning all the stripped wall remains, we put them in the trash bag.

 

One of the reasons why we do decommission work this time is, in the case of the aged and deteriorated wall, and/or functional damage, from the viewpoint of safety and durability, there may be necessary to install a new wall after decommission. After decommissioning all the places, we move to do the original state recovery and restoration work.

 

 

The original state recovery and restoration work

 

We newly assemble and mount LGS groundwork at the decommissioned place, and stick on the gypsum board.

 

Wall

 

before

①before

  • Before the work

 

after

①after

  • After the work

 

②before

②before

  • Before the work

 

 

②after

②after

  • After the work

 

Ceiling

 

新規天井LGS下地

New ceiling LGS groundwork

 

 

新規天井LGS下地-点検口設置箇所

New ceiling LGS groundwork-installing the inspection door place

 

 

We do LGS work, and mark the sign with masking tape at the inspect door place in advance.

Based on the making tape, we stick on gypsum board, and open a hole at the opened place in advance, then install an inspection door.

 

石膏ボード貼り

Sticking on a gypsum board

 

点検口設置

Installing an inspection door

 

 

 

We do so-called decorative cloth sticking work, painting work as for finishing, which is the end of our original state recovery and restoration work. Then, we hand the site to the customer.

 

 

 

Summary

This time, we constructed the original state recovery and restoration work at a restaurant in Shibuya.

The original state recovery and restoration work is, an important work operation to return the building and facility to the situation before moving in.

By carefully doing the work to match the custom’s needs, and securing the building beauty and safety, we did our best to be able to provide a comfortable environment for the next property tenant.

We are continuing to do our best to fully answer for our customers’ requirements to be able to provide their reliability and satisfaction too.

 

 

 

 

 

Please understand that we will execute construction in Japan only.

 

Finally,

 

From price quotation to construction work completion, our company is directly managing and doing construction work by ourselves.

So, we are supplying「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

Please do not hesitate to compare our quotation with other plural ones.

We also welcome other competitive quotations.

 

「How much is the approximate cost? How to execute construction of this part?」and so on, please take counsel wit us・give us your inquiry light heartedly!

 

 

On 《office・shop or store(property tenant)》 renewal work
・redecoration work(renovation work)
・recovery and restoration work,

we are glad to receive your construction work request from partly mending and repair work to full set of interior decorative work.

Please give us your inquiry light heartedly in the first place, as we are heartily waiting for your contact to us.

 

お問い合わせ

 

Instagram

Instagram

 X

空  X

Facebook

Facebook

 

 

 

 

 

We are sometimes updating SNS social media too.

We are waiting for your follow, it is good♡ by all means!

 

~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~

★If you look for an interior decorative construction contractor
at Ikebukuro, it is Kikuchi Souken Co., Ltd.★

★If you also look for original state recovery an restoration construction in Tokyo,
it is Kikuchi Souken Co.,Ltd.★

 

Address: 〒171-0014

4th floor, Musashiya No.3 Building,
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone: 03-5985-4252

~~~~~~~INTERIOR DECORATIVE CONSTRUCTION CONTRACTOR~~~~~~~

 

Japanese blog

 

施工事例|原状回復工事 渋谷区道玄坂 飲食店