Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, in all over Kanto area, executing construction work, taking charge of 《Interior decorative finishing work》《Recovery and restoration work》, for you.

 

This time, we are explaining a construction work site example of office building recover and restoration work.

 

The contents detail:

 

Construction work kind: recovery and restoration construction work.

Work site location:  Yokohama I-mark place building, Minato-mirai, Nishi ward, Yokohama city, Kanagawa prefecture.

Building kind: office building (a floor of building)

Construction work period: about 3 weeks

Recovery and restoration construction work details: Actual construction work detail changes depending on each property, however, this time, we execute following details:

Demolition: removal of partition(LGS(-light gauge steel)・partition)・removal of finishing fixture・demolition

Painting: painting of ceiling・wall・fixture

Cloth: re-sticking of cloth, patty repairing

Floor: re-sticking of tile carpet

Electricity: wiring under floor or so(electricity・telephone・LAN), removal of OA tap, changing of lighting equipment

Fine decoration(cleaning): cleaning of necessary points(window・floor or others)

 

Only for electric related construction work, let us request the relative professional vendor.

 

In the first place, we cure elevator and public areas, for preventing from hurting when moving materials and disposables.

After that, we execute demolition and removal of interior decoration, and go on returning to the original situation.

We remove installed partition, then let it restore the original layout.

We also need to remove electricity・telephone・LAN wiring or others.

In the case of introducing OA floor or OA tap, we will go on removing OA floor or OA tap.

Our construction work is finished by final cleaning at last.

 

The following pictures are from demolition on the way.

It is demolition work of partition wall.

In the first place, it is demolition work of board, heat insulating materials and LGS.

We execute repairing demolished points of ceiling, floor, pillar and others.

Although some ceiling areas are not yet filled, our construction work this time is almost finished.

 

 

 

From price quotation up to construction finishing work completion, our company is directly managing and doing actual construction work by ourselves, So we are supplying 「more reasonable and low at price, with high quality and good products」 to you.

 

「How much is approximate work cost?」

 

Your request of our price quotation is free of charge.

So, please give us your inquiry light heartedly!

 

Office renewal・shop or store redecorating・restoration work・reform work or the like, as for interior decorative construction work, please be sure to give your inquiry to our company light heartedly in the first place.

Please be sure to contact us.

 

 

Instagram     Twitter    Facebook   

Please also feel free to click ‘’following is nice♡!’’

 

~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~

★If you also look for interior finishing work・restoration work at Ikebukuro, ask for Kikuchi Souken Co. Ltd.★

 

Our address: 〒171-0014 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima, Tokyo

Phone: 03-5985-4252

~~~~~~~~~~~~~~~~INTERIOR FINISHING COMPANY~~~~~~~~~~~~~~~~