Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of《 Interior decorative construction work 》generally and《 Recovery and restoration construction work 》for you.

 

We wrote and uploaded Interior decorative construction work Technology series 』newly established starting from last time.

This time, it is our second article.

 

https://kikusou-gr.com/wp/yougoseris1-202303/

 

There may be existing this kind of information already in the internet.

However, our company coordinate by ourselves here, and we are introducing our construction work site pictures which can be prepared if any.

 

We are going to write and upload articles which you can finish reading relative easily.

So, we are glad if you will read them light heartedly.

 

What is putty treatment? Why it is necessary to do it?

 

Putty treatment in interior decorative construction work, is said to be a work operation of going on to putty up paste form overlaying or cladding material=putty, and flatten 凹凸, in order to get rid of surface 凹凸, after sticking base material such as gypsum board or so.

 

There are various sizes of board materials. In the case of gypsum board, the standard size is length × width as 910mm×1820mm.

 

 

Edge of this board size is a little angular. Even if sticked tightly, the joint part is becoming rather 凹凸.
(Occurring 凹凸 situation is called「 occurring unflat」.)

 

石こうボードのイメージ画像。引用:吉野石膏公式商品ページ

Gypsum board image picture.
Quoted from: Yoshino Gypsum Co. Ltd., official product web page.

 

 

 

パテ処理施工前の石こうボードの様子

After sticking gypsum board, prior to putty treatment situation. Showing here that there is凹凸 at the joint part and screw fixing place.

 

 

 

At the first coating material, we go on doing screw fixing (fixing board use screw by electric driver) basically. In order to prevent from occurring 凹凸 here too, we also treat to embed putty from the board material.

 

But, only with that treatment, we still cannot say that the surface is flat. If we do not go on making all of the sticked boards into a sheet of board, after painting and executing construction work of so-called decorative cloth (wall  paper), it may lead to occurring wrinkle or floating. Chances are that it may lead to happen peeling of so-called decorative cloth or crack thereafter.

 

Therefore, a work process of formulating paste form or powder putty agent, and applying wall, and flattening the surface is becoming indispensable.

 

 

Putty treatment construction work method

 

Puttying is done twice, or three times dividedly.

In the case of twice, they are called ①under putty, ②finish putty(on putty).
In the case of three times, they are called under putty, mid under putty, on putty, or so forth.

By using flat wide stainless spatula called「 putty spatula」, we go on applying putty agent on the board which was prepared for putty board.

 

 

At the joint part, we stick a kind of tape called joint tape tightly so as not to be peeled off.

 

Then, we go on applying under putty on that. (In the case of pasteless type, after applying putty, we go on sticking tape.)

 

We apply finish putty (on putty) as if covering tape. After drying it, we rub with sand paper, and flatten it, then wipe off occurred powder.

 

At the outer edge part, we attach corner reinforcing tape or called corner guard, not joint tape, then duly execute construction work in the same manner.

 

We go on puttying at the screw fixing part too, filing similarly and flattening it. When filing, in order not to hurt the board material, we go on finishing politely and speedily.

 

In any event, operation work of making sticked first coating materials into as if a sheet of flat board is putty work operation.

 

As it will affect finished situation of painting and so-called decorative cloth very much, although it is not visible after construction work, we can say that it is a very important work process.

 

 

 

 

 

Construction work site example at our company

 

We are briefly explaining construction work site example at our company as follows.

 

As it is the work site of introducing『 laminated plastic sheetin our terminology series last time too.
We are briefly explaining construction work situation of executing putty at the board material.

 

Before executing construction work, and on the way

 

某喫茶店ボードパテ塗り途中の様子。施工開始直後のため、後方には施工前の手つかずの状態がまだ残っている

This is just after starting putty construction work operation. Situation before construction work is vivid behind too.

 

 

 

 

After construction work

某喫茶店ボードパテ塗り完了の様子。コーナー補強材を含め表面が平坦になっているのがわかる

This is after construction work of former above picture. Not to occur unevenness, puttying and filing have completed.

 

 

Finally

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

Please do not hesitate to compare our quotation with other plural possible contractors, as we welcome your comparing competitive quotations.

「How much is approximate construction work price? How to execute construction work of this part?」and so on. We welcome your relative counselling・inquiry to us light heartedly!

 

On office renewal・shop or store redecoration・recovery and restoration work・reform work(interior decorative work) and so on, please give us your inquiry in the first place light heartedly, as we are waiting for your contact to us.

 

https://kikusou-gr.com/wp/contact/

 

 

Followings are SNS links which our company is managing.

Three colored clicking marks: Instagram, Twitter, Facebook.

 

Instagram     Twitter   Facebook  

 

We are waiting for your clicking, follow・nice!

 

 

 

~~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~~

★Interior decorative construction work contractor at Ikebukuro★

★Recovery and restoration work・full set of interior decorative work・office relocation★

Kikuchi Souken Co., Ltd.

〒171-0014

Address:4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone: 03-5985-4252

~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~

 

 

Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of《Interior decorative construction work》generally and《Recovery and restoration construction work》for you.

 

This time, we are roughly explaining hat joint construction work.

 

It is the latest version article which we also introduced before.

 

Hat joint construction work

https://kikusou-gr.com/wp/%e3%83%8f%e3%83%83%e3%83%88%e7%9b%ae%e5%9c%b0%e6%96%bd%e5%b7%a5/

 

As many of you probably wonder what on earth is hat joint?
So, we are briefly explaining it in this article at first.

 

If you do not need to read that explanation, and would like to see our construction work situation, then please directly visit and see the subtitle of「Hat joint construction work situation」below.

 

 

In the first place, What is joint?

 

Firstly, besides gypsum board which we are explaining this time, joint is pointed to be a gap arising between construction materials such as tile, stone materials and so on.

 

You may possibly have seen「 cauking 」was done between bricks at that mesh patterned joint between bricks and in the toilet or wet area.

 

 

As we above-mentioned, depending on materials, joint is cauked, is thrusted and filled with putty and so on, or joint materials such as joiner is embedded.

 

The work, Joiner seems to have the nuance of「 tying thing」.

 

 

The reason why we treat joint.

 

The reason why we treat joint varies a lot depending on the places and part materials. The biggest and main reason and role can be probably said「 Cutting the edge, and preventing each material from interfering and wearing. 」

 

 

Depending on the temperature and humidity, there is a possibility of materials occurring shrinking, crooking and so on.

 

Furthermore, because of external factors such as earthquake and so on, materials may also occur to be pushed out or pulled in toward all the direction.

 

Therefore, by taking joint a little widely or so, chances are that it is often executed constructing work to be able to buffered。

As for other purpose, there is an addition of decorativeness.

 

The joiner which we are introducing this time is a kind of joint material(changeoff material) 「which can make joint to finish with a certain interval」.

By inserting and sticking joint, there is a merit of preventing it from interfering materials each other, while making materials appear neatly.

 

There are various kinds of joiners. Comparing with the case of simply embedding calking, it can make a good joint in appearance.

 

Component materials used at different finishing places each other such as joiners, or component materials to be used at constructing different direction parts crossed such as ceiling and wall part are called 「changeoff material」.

 

We may be also going to introduce other changeoff materials later.

 

 

Hat joint construction work situation

 

Our introductory remark may have been long so far, however, we are explaining the situations of hat joint construction work site at a certain office warehouse from here.

 

 

ハットジョイナー施工中の様子

Actually just under executing joiner situation.
In order to execute joiner, the joint is taken out rather largely than vertical direction boards’ joint each other.

 

 

 

Because the picture is taken as slightly going down, it may not be very clear, please pay close attention to the worker’s hand.

 

Rather larger joint than usually was being made in the horizontal direction. We are going to insert 「hat joiner 」in this gap.

 

As the joint cross section looks like silk hat, it is called hat joiner.

 

The purpose of inserting joiner this time is「Upper part by painting, and lower part by so- called decorative cross finishing, cutting the edge is recommended.」.

 

As above-mentioned, in the case of mutual materials, especially in the case that the material and the finishing or so are different, we can say that「cutting the edge」construction work is indispensable.

 

By cutting the edge, we can reduce what to affect painting or sticking so-called decorative cloth for external factors such as humidity, earthquake and so on.

 

In this connection, hat joiner is also used for outside wall part joint, besides interior decoration.

(The joiner for outside wall use is different from that of interior decorative use on size and material very much. )

 

 

 

 

 

ハットジョイナー近接画像

Hat joiner close-up picture(As we lost the original picture data, the company logo is the former one, sorry!)

 

 

 

 

 

When embedding joiner, we go on sticking at the back side of joiner with glue.

 

At this time, in order not to leave too much glue, and in order to be able to stick firmly, we carefully go on executing construction work.

 

If leaving too much thickness, when finishing putty treatment, it is getting hard to flatten it, and it will take time for adjusting it.

 

Because it is going to be hard to adjust it by work operation as time goes on, the first step is crucial.

 

 

 

 

ジョイナー糊付け施工完了時の様子

Finish gluing hat joiner situation.
After this, we do patty treatment again. We go on adjusting the bedding to flatten gypsum board surface.

 

 

 

The direct above picture is the situation of already finish gluing hat joiner generally.

 

After this, same as the mutual gypsum boards joint and the screw fixing place, we do putty treatment. After that, when sticking so-called decorative cloth and painting, we adjust not to arise floating or 凹, and we actually transfer the work site to the following painting・sticking so-called decorative cloth construction work process, then our work is finished.

 

 

 

 

Summary

 

We so far roughly explained hat joint construction work about the joint construction work itself, and the actual construction work situation as above.

 

As this time, in the case of different finishing at the upper part and lower part or so, 「cutting the edge 」of joiner and executing construction work of changeoff material happen to be often.

 

Upon your request, it is certainly possible for us to execute the relative construction work.

 

Besides, if you happen to have questions・counselling and so on such as「At the place like this, how should I request construction work?」, please be sure to talk with us light heartedly.

 

It is possible for us to answer for the . whole process, and part of the process construction work too. So, we are waiting for your relative inquiry.

 

 

 

 

 

 

Finally,

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves. Our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

As construction work cost often differs very much according to work contractors, so we recommend you to compare plural quotation prices.

 

Comparing our quotation with others, please be sure to consider your order to us.

 

On 《office・shop or store(tenant)》 renewal work・redecoration work(reform work)・recovery and restoration work, we are glad to receive your construction work request from partly mending and repair work to full set of interior decorative work.

Please give us your inquiry light heartedly in the first place, as we are heartily waiting for your contact to us.

 

https://kikusou-gr.com/wp/contact/

 

 

 

 

Instagram     Twitter   Facebook  

Three colored clicking marks: Instagram, Twitter, Facebook.

Please light heartedly click icons, follow is also nice♡!

~~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~~

★Interior decorative construction work contractor at Ikebukuro★

★Recovery and restoration work・full set of interior decorative work・office relocation★

Kikuchi Souken Co., Ltd.

〒171-0014

Address:

4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone: 03-5985-4252

~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~