Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of executing construction work of《Interior decorative construction work》generally《Recovery and restoration construction work》for you.

 

This time, we are thinking of roughly explaining,

 

Inspection hole, and its installation construction work, which comes to be related to interior decorative construction work, and its facility work.

 

What is inspection hole? And on its role.

 

Inspection hole is, by executing construction・installing at the ceiling, wall, floor and so on, you will be able to check and diagnose・examine inside situations.

 

As we will below-mention it, however, according to what to be「watched・checked」inside, it is executed construction・installation at various places.

 

Places where inspection hole is installed.

 

Ceiling

天井点検口参考画像

Situation of general ceiling inspection hole.

 

 

Inspection hole installed at the ceiling, is called「ceiling inspection hole」just as it is.

According to various checking items, there are a lot of plural places existing on the same floor too.

 

According to manufacturers, there are such products named as「ceiling hatch」「high hatch」and so on. Hatch=moving up and down way, entrance hole with lid.

 

Main inspection items are:

 

  • ●Electricity, internet wiring.
  • ●Ventilating fan duct.
  • ●Housing diagnosis.

and so on.

 

However, as for interior decorative construction work, if stain of water leakage at the ceiling due to rain leakage should be found, situations are checked from inspection hole too. Or, inspection hole may be tentatively newly installed, and may be checked inside.

 

As for residence which has attic storage, there is such kind of ladder for moving up and down at attic, a ladder when it opens, it will come to be pushed out as open hole part too.

 

Above these can be also said a kind of inspection hole, as the meaning of attic inspection.

 

In old Japanese style residence, chances are that there is not inspection hole often.  Such residence at upper part of closet storage or a sheet of board at storage space above closet can be pushed and removed. From there, inspection and diagnosis can be carried out.

 

Wall

 

There are not many places which is attached to wall inspection hole.

In many cases, it is installed inside housing apartment, unit bath, or washroom.

 

Its main inspection item is,

 

Piping arrangement (water supply and drainage equipment)

 

Underfloor inspection hole

床下点検口、並びに床下収納の参考画像

An example of underfloor inspection hole, and underfloor storage.

 

 

Underfloor inspection hole can be often noticed at the kitchen, and it is often combined with underfloor storage too.

 

Its main inspection items are,

 

  • ●Underfloor piping arrangement(water supply and drainage)
  • ●Residence diagnosis(Basic situation, grasping termite and ant damage situation, humidity and so on)

 

As this, inspection hole inside is usually not noticed very much.

Naturally, by checking inside, various situations in the building can be grasped.

So, in building maintenance work operation, it is an indispensable equipment.

 

As we explained above, it is equipped in various places, so all of them are necessary open holes.

 

Regarding temporary installed inspection hole, its procedures.

 

As we explained ceiling inspection hole above, if rain leakage should occur at the ceiling, or if electric wiring should be newly done in the existing building or so, there is an occasion of executing construction work and installing temporary installation of inspection hole.

 

We are roughly explaining its procedures.

 

This time, we are explain by taking up an example of「inspection hole installation for water leakage」.

 

① Selecting open hole place, and width.

 

Checking rain leakage at the ceiling with eyes. In the first place, checking if the location of water supply and drainage pipe can be noticed from existing inspection hole.

 

If the situation can be grasped from already installed inspection hole, it is not necessary to newly install inspection hole.

 

Check the situation of water supply and drainage pipe from already installed inspection hole first. If it is judged that its cause or problematic place cannot be confirmed or cannot be confirmed from that location, then, we will prepare to install temporary installation of inspection hole at a suitable place.

 

② Studying temporary installation of inspection hole place(testing, marking)

 

If identification of the cause or grasping the situation could not be done by above ①, then, we go on selecting a place for temporary installation of inspection hole.

 

At closely connected structure building body part, if it should be opened, then, its strength may be going down. While, if the cause identification or grasping situation from opened place cannot be done, then, there is going to be meaningless of opening it.

Therefore, we shall study where to open hole carefully.

 

 

吊り天井、並びに軽鉄下地の様子

As a reference, we have prepared a situation picture inside the ceiling clearly as above. In this picture, as reinforcement of earthquake is done more, bedding material is dense.  By and large, LGS(=light gauge steel) bedding is mounted square-shaped as this. Wiring, piping, and duct are stretched around at the roof space.

 

 

 

As it is off the subject, however, in order to open inspection hole without hurting bedding material, we sometimes use board cutter too.

 

ボードカッターの参考画像(マキタ公式サイトより拝借)

Above is Makita Co. product board cutter reference picture. It can be eventually cut off by letting blade at picture upper part push against board material, slowly going on to move blade just as drawing a line, then cutting it off. Picture quoted from Makita Co. official web page.

 

Above is Makita Co. product board cutter reference picture.

It can be eventually cut off by letting blade at picture upper part push against board material, slowly going on to move blade just as drawing a line, then cutting it off.

Picture quoted from Makita Co. official web page.

 

By pushing blade against board material at upper part, slowly going on by moving it, then you will be able to cut it off just as saw.

 

It is possible to adjust blade length, and only cut off board material without hurting bedding material. Transparent area at the right part of the picture is dust box, so it can reduce powder dust.

 

As we may have averted from our explanation a little, when opening hole after all, in order not to hurt bedding material, by using needle for searching bedding or a tool called sensor, then  we cut off board material.

 

③ Cutting off board material, then opening hole. After that, depending on circumstances, strengthening opened inspection hole, and installing inspection hole frame, then it is finish of the installation.

 

Checking the size in advance, and do marking so as to fit the inspection hole, then going on opening hole.

 

As for hollowed out board material, if it does not have hurt, it can be used as the lid as it is. So, we shall store it where it is easy to be located, not to throw it away.

一般的な天井点検口の参考画像

A general ceiling inspection hole reference picture. Quoted from Monotaro product page. The product name is『DAIKEN ceiling inspection hole (standard type)』

 

 

When opening hole, it will definitely come to require to cut off a piece of joist.

So, we shall do work operation of strengthening opened hole in order to recover strength at the cut off part.

 

After finish strengthening opened hole, finally, we attach outer frame to the opened hole place, and attach hollowed out board material to the inner frame. Then, we fix both with metal fitting. If we can confirm smooth opening and closing, the installation work is thus finished.

 

It seems that there may not be enough chance to look at it carefully, however, in our abovementioned explanation, as there is「standard type」, there are various materials・kinds of inspection hole too.

 

There is an inconspicuous type of it too. So, if you would like to install for regular checking, not for temporarily, we would like to suggest you to tell us of that effect.

 

We so far have explained inspection hole installation above with a little bit redundancy.

 

Explaining construction work example including inspection hole installation.

 

As we previously executed construction work of interior decorative bedding at a food court tenant of commercial facility, we are explaining that situation as below.

 

As it is a large scale renovation, we re-sticked each place of LGS (=light gauge steel) bedding and board material too.

 

https://kikusou-gr.com/wp/construction-work20221015/

 

 

Summary

 

We so far explained What is inspection hole? And the role of installation construction work.

 

  • ●Inspection hole is, installed at the ceiling, wall, and floor. It can be carried out for grasping  building various situation, and diagnosis.
  • ●Ceiling inspection hole is, enable us to find out appropriate place at first, partly cutting board material and bedding material, opening hole, then installing it.
  • ●It can fit various ceiling, there are many kinds.

 

After reading this article, if you should come across uneasy points or need to counselling with us or so, please be sure to give us your inquiry light heartedly.

 

Let alone owner or managing company with rain leakage troubling property or so, please give us your attention if you would like to request these construction work to us as equipment contractor, general contractor or so. We are very happy if you consider to request our quotation in the first place.

 

Regardless of whole or partly construction work, our company is accepting your renovation work, remedial and repair work, mending work and so on.

 

On the whole interior decorative work, or partly participating process work too, please give us your inquiry light heartedly.

 

Finally,

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

Please do not hesitate to compare our quotation with other plural possible contractors’, as we also welcome your competitive quotations very much.

「How much is approximate construction work cost?」

「How to execute construction work at this part?」and so on, please give us your counselling・inquiry light heartedly.

 

On office renewal・shop or store redecoration・recovery and restoration construction work・ reform work(interior decorative construction work) and so on, please give us your inquiry in the first place light heartedly, as we are waiting for your contact.

 

SNS links which our company is managing are as follows: Instagram, Twitter, Facebook.

Instagram     Twitter   Facebook  

We are waiting for your following・I like it!

~~~~~~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~~~~~~

★Interior decorative construction work contractor at Ikebukuro★

★Recovery and restoration work・full set of interior decorative work・office moving★

 

Kikuchi Souken Company Limited

Office address:〒171-0014

 4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone: 03-5985-4252

~~~~~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~~~~~

Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of all of《 Interior decorative construction work 》《 Recovery and restoration construction work 》for you.

 

This time, we are thinking of roughly explaining recovery and repair construction work, and the term difference from renovation work and other kind of work which our company is mainly taking charge of.

 

For those who will request to do construction work may not be directly related to this matter. However, if you should think the following kind of works unclear or doubtful, please read this article, which may make us feel pleased.

 

Ancillary to this article, we are also explaining seemingly similar construction work terms this time.

 

In our previous blogs, we wrote and uploaded the article of「 points to be noted ・points to be checked when requesting ・considering recovery and restoration work 」before last time, and 「 work operation and construction work which may occur in recovery and restoration work 」 last time here.

 

As we are also explaining in this article later, if you would like to check recovery and restoration work in advance in detail, we suggest you please read the following contents together.

 

Examples of construction work kind names (Excluding getting off from interior decorative work)

 

  • ●Newly construction work
  • ●Newly decorative construction work
  • ● (Newly installment construction work)
  • ●Recovery and repair construction work
  • ●Renovation construction work
  • ●Mending and repair construction work
  • ●Remedial and repair construction work

 

 

●Newly construction work

 

Picture of a newly construction work example. An apartment construction work on the way

Picture of a newly construction work example. An apartment construction work on the way.

 

Concerning newly construction work, it may not be necessary to explain it particularly. However, we are still also explaining it for comparing with other construction work.

 

Newly construction work is a term to be pointed out before interior decorative work as whole work process to make building base ・ building body part all from the start.

 

That is, if it is a newly construction building, interior decorative work also becomes a part process in newly construction work.

 

●Newly decorative construction work

 

Literally, newly decorative construction work is pointed out as 「refreshing decoration」 work.

 

For example, in the case of a former property renter of a restaurant leaves, and another new property renter starts new restaurant, when doing construction work such as newly reconstructing interior decoration or signboard, it may be called as 「newly decorative construction work」.

 

For that reason, besides interior decorative construction work, other than signboard work and equipment work, in the case of painting work as outside wall painting, newly decorative construction work are naturally all included too.

 

●(Newly installment construction work)

 

Newly installment construction work is pointed out as whole work of newly installing electric machine, other equipment, and fixture goods.

 

As for interior decorative construction work, for example, a kind of work name of called newly installment construction work is used in the case of newly installment of partition and the like in the office.

 

Written as above, as its work is a wide range term, not limited to construction, it is also used for various operation kinds such as civil engineering work and a work accompanying with machine installment.

 

●Recovery and repair construction work

 

Recovery and repair construction work is pointed out as building 「repairing and altering for betterment」 work.

 

In addition of returning old and deteriorated part to the original situation, changing heat insulating material to higher performance product, making handicapped accessible, or doing work for enhancing function, we often call these as recovery and repair construction work.

 

As we are describing later, the purpose of recovery and repair work mainly is function recovery, while recovery and repair work can be said as visually and functionally all are expected to enhance, so to speak, the work for betterment of property value.

(As it is off the main subject, mending and repair work can be also said to expect betterment of property value by carrying out wide range mending and the like. )

 

As nuance aspect is strong, the term of “renovation can be often recognized as division of this recovery and repair work.

 

The purpose of this work is enhancing function, however, as for aged building, for fitting modern partition and lifestyle, chances are that we may often do various construction work for changing visually very much too.

 

 

●Renovation decorative construction work

 

 

Picture at a coffee shop renovation decorative construction work. Here, as it is a former decorative property situation, property renters changed from a coffee shop to another one

Picture at a coffee shop renovation decorative construction work. Here, as it is a former decorative property situation, property renters changed from a coffee shop to another one.

 

 

Literally, renovation decorative construction work is often named as 「correcting decorative construction work」.

 

New renter moved in shop or store of former decorative furnished situation and the like, in the case of modifying decorative situation for own shop or store specifications, it can be said as renovation construction work.

 

The work site which we explained in above picture is, at the property of former renter company managing a coffee shop before, then another company moved in as tenant. Except for changing table and household goods, work of wallpaper re-sticking and painting, tile and floor material re-sticked or so were done, but without changing interior decorative layout.

 

 

●Mending and Repair construction work

 

Mending and repair construction work is pointed out to be returning building situation up to the same standard of new construction as for work operation scope in interior and exterior decoration and so on.

 

Naturally including due to internal ・ external factors, interior and exterior decoration which suffered damage, equipment should be also restored in order to be able to use the same situation as new construction.

 

For that reason, 「 recovery and restoration work 」can be also said to be a kind of mending and repair work.

 

Depending on building and housing apartment, in order to vastly repairing interior and exterior decoration called 「large scale mending and repair work」, constructing work of foothold is occurring to be necessary.

 

Written as above, mending and repair construction work is often done regularly as planned.

 

●Remedial and repair work

 

Inspection work site

Picture here is a work site of checking door installing work necessary at the time of checking electric・waterworks equipment and rain leak or so. As it is a site shortly before, please note our company logo is an old one.

 

 

Situation of completing checking door installment.

Situation of completing checking door installment.

 

 

Remedial and repair construction work is pointed out as「 recovering 」work up to the degree without problem at the place where deterioration ・ defect should occur.

 

For that reason, as it were, it seems that it can be apprehended as a kind of work of「 emergency treatment 」「 make-do 」.

 

In interior decorative work, for example, when rain leak should occur, work of re-sticking so-called decorative cloth or demolishing board at soaked place only and re-stick it or so can be said a kind of remedial and repair work.

 

As above, since it can only be said to be emergency treatment work, even if you may feel it seems that there is no problem, we recommend you to plan mending and repair work, not only planning remedial and repair work.

 

 

Reference article: “Remedial and repair work

 

 

Summary

 

We so far explained What is recovery and repair construction work? and difference from renovation work.

 

As our conclusion, the term of ○○construction work differs according to standpoints and each executing company’s nuance.

 

For example, we took up and wrote an example of coffee shop on renovation work as above. From the standpoint of executing construction work company, it is a「renovation construction work」from a shop to another shop, as it certainly is renovation work. However, from the customer’s standpoint, as it is a new shop opening from an old one to a new one, it can be said a「new decorative work」.

 

As construction work name is usually set by general contractor, please well understand that work name may come to rarely but sometimes occur to be different from what you thought to be too.

 

After reading this blog, if there should be uneasy points or matters to talk with us and so on, please give us your inquiry light heartedly.

 

On renovation work, mending and repair work, and remedial and repair work and so on, regardless of total work or part work, our company is welcoming to accept your request of relative construction work.

 

Concerning total construction work of interior decorative work and also concerning participating partly processing work too, please give us your inquiry light heartedly.

 

 

Finally,

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「 reasonable construction work as much as possible, and high quality, better work service 」to our customers.

 

Please do not hesitate to compare our offer details with those of other plural relative companies. We welcome your comparing our quotation with others.

「How much is approximate work price?」

「How to do work at this part?」and so on, please give us you counselling and inquiry light heartedly.

 

On office renewal・shop or store renovation・recovery and restoration work・reform work(interior decorative work) and so on, please give us your inquiry light heartedly in the first place.

We are waiting for your contact to us.

 

 

Following is SNS links which our company is managing.

 

Instagram     Twitter    Facebook    

 

We are waiting for your following is good!

 

~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~

★If you look for interior decorative work unit in Ikebukuro, it is Kikuchi Souken Co.Ltd.★

★If you also look for recovery and restoration work in Tokyo, it is Kikuchi Souken Co.Ltd.★

Address 〒171-0014

4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone   03-5985-4252

~~~~~~~~~~~INTERIOR DECORATIVE FINISHING COMPANY~~~~~~~~~~~~

 

 

 

Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are executing all of《Interior decorative construction work》《Recovery and restoration construction work》for you.

 

This time, we are explaining a newly construction work site at a set meal diner.

 

Construction work kind:Newly decorative work

Construction work site location:a restaurant(set meal diner) at food court in commercial facility in Takasaki city, Gunma prefecture

Construction work details:Executing LGS (=light gauge steel) work at the ceiling, wall and doing board finishing work.

Our work also includes making inspection door and other detailed work.

 

Followings are construction work site pictures.

After doing LGS work at the ceiling, we execute board work.

 

 

We also do LGS work at the wall, and stick board work.

 

After mostly having completed ceiling and wall work, we also execute various construction work of LGS work or so at surrounding construction work places(pillar or so).

 

 

Finally, we execute construction work at the remaining places.

 

After installing inspection door at the place where a hole is opened in the ceiling, we hand our work to the following construction work company.

 

Above are the construction work details this time.

 

 

Please see here for information on board construction.

https://kikusou-gr.com/wp/board-work/

 

It is possible for us to execute construction work at any commercial facility tenants, restaurants, and any shop or store too.

 

Please give us your relative inquiry light heartedly.

 

 

 

 

Finally

From price quotation up to construction work completion, our company is directly managing and doing construction work

by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

Please do not hesitate to compare our offer details with those of other plural relative companies. We welcome your comparing our quotation with others.

「Which company should I request construction work? How much is approximate work price?」and so on.

 

On office renewal・shop or store renovation・recovery and restoration work・reform work(interior decorative work) and so on,

please give us your inquiry light heartedly in the first place.

We are waiting for your contact to us.

 

 

 

 

Instagram     Twitter    Facebook    

 

Please also light heartedly press👍 stating that your following is good, isn’t it♡.

 

 

 

~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~

★If you look for interior decorative work unit in Ikebukuro, it is Kikuchi Souken Co.Ltd.★

★If you also look for recovery and restoration work in Tokyo, it is Kikuchi Souken Co.Ltd.★

Address 〒171-0014

4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone   03-5985-4252

~~~~~~~~~~~INTERIOR DECORATIVE FINISHING COMPANY~~~~~~~~~~~~