Hello, everyone! This is Kikuchi Souken Company Limited website.
Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of《 Interior decorative construction work 》generally and《 Recovery and restoration construction work 》for you.
We wrote and uploaded 『 Interior decorative construction work Technology series 』newly established starting from last time.
This time, it is our second article.
https://kikusou-gr.com/wp/yougoseris1-202303/
There may be existing this kind of information already in the internet.
However, our company coordinate by ourselves here, and we are introducing our construction work site pictures which can be prepared if any.
We are going to write and upload articles which you can finish reading relative easily.
So, we are glad if you will read them light heartedly.
What is putty treatment? Why it is necessary to do it?
Putty treatment in interior decorative construction work, is said to be a work operation of going on to putty up paste form overlaying or cladding material=putty, and flatten 凹凸, in order to get rid of surface 凹凸, after sticking base material such as gypsum board or so.
There are various sizes of board materials. In the case of gypsum board, the standard size is length × width as 910mm×1820mm.
Edge of this board size is a little angular. Even if sticked tightly, the joint part is becoming rather 凹凸.
(Occurring 凹凸 situation is called「 occurring unflat」.)

Gypsum board image picture.
Quoted from: Yoshino Gypsum Co. Ltd., official product web page.

After sticking gypsum board, prior to putty treatment situation. Showing here that there is凹凸 at the joint part and screw fixing place.
At the first coating material, we go on doing screw fixing (fixing board use screw by electric driver) basically. In order to prevent from occurring 凹凸 here too, we also treat to embed putty from the board material.
But, only with that treatment, we still cannot say that the surface is flat. If we do not go on making all of the sticked boards into a sheet of board, after painting and executing construction work of so-called decorative cloth (wall paper), it may lead to occurring wrinkle or floating. Chances are that it may lead to happen peeling of so-called decorative cloth or crack thereafter.
Therefore, a work process of formulating paste form or powder putty agent, and applying wall, and flattening the surface is becoming indispensable.
Putty treatment construction work method
Puttying is done twice, or three times dividedly.
In the case of twice, they are called ①under putty, ②finish putty(on putty).
In the case of three times, they are called under putty, mid under putty, on putty, or so forth.
By using flat wide stainless spatula called「 putty spatula」, we go on applying putty agent on the board which was prepared for putty board.
At the joint part, we stick a kind of tape called joint tape tightly so as not to be peeled off.
Then, we go on applying under putty on that. (In the case of pasteless type, after applying putty, we go on sticking tape.)
We apply finish putty (on putty) as if covering tape. After drying it, we rub with sand paper, and flatten it, then wipe off occurred powder.
At the outer edge part, we attach corner reinforcing tape or called corner guard, not joint tape, then duly execute construction work in the same manner.
We go on puttying at the screw fixing part too, filing similarly and flattening it. When filing, in order not to hurt the board material, we go on finishing politely and speedily.
In any event, operation work of making sticked first coating materials into as if a sheet of flat board is putty work operation.
As it will affect finished situation of painting and so-called decorative cloth very much, although it is not visible after construction work, we can say that it is a very important work process.
Construction work site example at our company
We are briefly explaining construction work site example at our company as follows.
As it is the work site of introducing『 laminated plastic sheet 』in our terminology series last time too.
We are briefly explaining construction work situation of executing putty at the board material.
Before executing construction work, and on the way

This is just after starting putty construction work operation. Situation before construction work is vivid behind too.
After construction work

This is after construction work of former above picture. Not to occur unevenness, puttying and filing have completed.
Finally
From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.
Please do not hesitate to compare our quotation with other plural possible contractors, as we welcome your comparing competitive quotations.
「How much is approximate construction work price? How to execute construction work of this part?」and so on. We welcome your relative counselling・inquiry to us light heartedly!
On office renewal・shop or store redecoration・recovery and restoration work・reform work(interior decorative work) and so on, please give us your inquiry in the first place light heartedly, as we are waiting for your contact to us.
https://kikusou-gr.com/wp/contact/
Followings are SNS links which our company is managing.
Three colored clicking marks: Instagram, Twitter, Facebook.
We are waiting for your clicking, follow・nice!
~~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~~
★Interior decorative construction work contractor at Ikebukuro★
★Recovery and restoration work・full set of interior decorative work・office relocation★
Kikuchi Souken Co., Ltd.
〒171-0014
Address:4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo
Phone: 03-5985-4252
~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~
大家好!我们这里是菊池综建株式会社的网站。
在东京都丰岛区池袋设置着公司办公据点,在关东地区全部地域范围内,我们正在经营和施工全部的《室内装饰施工工事》和《修复原状施工工事》,为客户服务。
从上次开始,我们在本网站里新设了『室内装饰施工工事 术语集锦』。
此次是第二个文章。
看来,因特网上已经存在着那种集锦。
不过,作为我公司职员,自己来总括,而也可以准备有关施工照片的场合,我们就一起来介绍。
我们就要作为可以比较简单读完的内容,所以希望各位乐意地阅览一下,那么我们很高兴。
Q什么是油灰处理?为什么需要做那个?
室内装飾工事の灰処理とは,基礎材を石膏ボード等に貼った後,表面の凹凸を除去するために,tがペースト状の肉様材料=油灰に打ち込み,徐々に作業を平準化していくという。
シートは様々なサイズで来る。 石膏シートの場合、一般的なサイズは、910mm×1820mmの縦と横のサイズです。
その大きさの板材は,その角部にやや角がある. 正確には、投稿の場合には、接続部分もかなりバンプになります。
(凹凸が現れる状態を「出凹凸」という)

石膏板的印象图像。
引用:吉野石膏公司正式商品网页

张贴石膏板后,油灰处理前的样子。看得出来连接部分和螺钉安装部位处有凹凸。
并且,在地基材料,基本上,我们就安装螺钉安装部位(把板材用的螺钉,使用电动螺丝刀来安装)。
不过,为了这个也不出来凹凸,我们从板材的表面也处理埋进去。
但是,只是那个处理的话,表面还是不可以说平坦。如果要不把被张贴的板材都逐步作为一张板似的话,后来,涂装和施工所谓的装饰用织物(壁纸)之际,会出现皱纹或浮动。以后,根据情况,所谓的装饰用织物有可能引导剥掉和破裂。
因此,提炼糊状或者粉末油灰剂,而涂抹壁上后,把表面弄平坦。这些工程成为不可缺少。
油灰处理的施工方法
油灰处理是两次或三次,都分别而做。
做两次的场合,①下油灰,②最后加工油灰(上油灰)
做三次的场合,下油灰,中油灰,上油灰,等 就叫做这些。 我们使用叫做「油灰抹刀」的又平又横宽的不锈钢抹刀,而在油灰板准备过的油灰剂逐步涂抹板材。
在连接部位,我们把叫做连接胶带的胶带,为了避免剥离来紧贴。
我们在上面逐步涂抹下油灰。(无糊类型的场合,涂抹油灰后,逐步张贴胶带)
我们把胶带掩盖,涂抹最后加工油灰(上油灰)。把它干燥后,我们打磨砂纸,弄平后,擦掉发生过的粉末。
在出角部分,张贴或安上的不是连接胶带,就是角部补强胶带或者角部保护器,而同样来施工。
我们在小螺钉安装部位也涂抹油灰,同样打磨鑢,逐步弄平坦。
打磨鑢之际,为了避免损坏板材,我们又周到又迅速地做完。
总之,把在地基材料粘贴过的板材,成为仿佛一张平坦板的作业叫做油灰作业。
此作业会影响涂装和所谓的装饰用织物的最后加工结果。因此,施工后,虽然在外边看不到,但它可以说是个非常重要的工程。
我们公司的施工事例
我们简单地要介绍一下本公司的施工事例。
我们在上次写的用语集锦『薄片层压塑料膜』里也介绍过施工现场。
为了施工室内上边部分装饰壁的所谓装饰用的织物,我们简单地来介绍一下在板材施工油灰的样子。
施工之前,中途

这张是刚开始施工油灰作业后的样子。在后边施工之前的样子也很清晰。
施工之后

这张是把上一张施工后的样子。为了不出不平坦(凹凸),做完了涂抹油灰,打磨鑢。
最后
从报价到施工完毕,我们公司全部都是亲自安排施工工事,我们的目标是给客户供应「尽可能便宜的、质量高的好产品」。
请不客气地把我们的报价和其它单位的复数同行业界报价比较一下。我们也欢迎各位的货比三家。
「施工工事费用大概需要多少钱? 这个部分怎样做工事好? 」
等,请乐意和我们商量・查询业务!
关于办公室的翻新・店铺改装・修复原状施工工事・整建整修工事(室内装饰工事)等,首先请乐意来商谈・查询!我们正在等待各位来联络。
https://kikusou-gr.com/wp/contact/
现在,我们公司经营的SNS(社交网络服务)链路一栏。
我们等待各位的点击、追踪、关注,即真不错!
~~~~~~~~~~~~~~池袋~~~~~~~~~~~~~~
★我们是池袋的室内装饰施工工事行业单位★
★修复原状施工工事・整套室内装饰工事・办公室的搬迁★
菊池综建株式会社
邮政编号: 〒171-0014
东京都丰岛区池袋2-62-10 武藏屋第三楼四层
电话: 03-5985-4252
~~~~~~~~~~室内装饰施工工事单位~~~~~~~~~~
We thank you very much for visiting and read our『Kikuchi Souken Co.,Ltd.』website homepage.
Our company office is base beddingd at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an『interior decorative construction contractor』taking charge of full set of 『Interior decorative construction』・『recovery and restoration』for you.
This time, we are explaining,
「Bath panel construction」.
In the first place, probably some of you may wonder what is bath panel construction?, so we are explaining it firstly.
Another name of【bath panel】is bath ribbed paned and is used at/for bath ceiling・wall decorative material.
『Ribbed』of this bath ribbed panel is pointed to be, rectangular 凸shape after all.
In fact, as slope is included on the panel, so it seems that its cross section is like trapezoid shape often.
Taking this above-mentioned「ribbed」into account, bath ribbed panel is, a product name for bath room use ceiling finishing material, which is a ceiling material excelling in water resisting property and moisture resisting property.
It is longitudinally ribbed molded shape generally, and is mainly often seen at public bath and so on.
It was also often seen in multiple residence before. However, as various materials have been increasing in the market these days, so it has come to be seldom seen.
Its raw materials are plastic and incombustible specification aluminum.
As it was heat insulated, it exceled in heat insulation, it is not easily rusted or so, and it was processed to keep from fungus or so.
For heat insulating purpose, it seems that it is often integrated with hard type foamed urethane or so.

Picture quoted from: Fukuvi Chemical Industry Co.,Ltd. website
On bath panel, please also be sure to refer to Fukuvi Chemical Industry Co.,Ltd. website page.
Incidentally, as for reforming of new construction (such as food factory, caring elder people facility, big bath, Japanese style hotel bath, swimming pool) and warm-bathing facility, multiple complex residence using bath, please be sure to request and rely on our professional interior decorative contractors.
Unless executing right construction, it may give rise to various trouble, such as rust. So, please be careful!
We are explaining bath panel construction as follows.
On bath ribbed panel construction(bath panel construction)
There are plural bath panel construction methods.
This time, we are explaining one of them with construction site example.
It is a property(hotel) construction example.
Construction contents:
Construction kind: repair and recovery construction
Site location: big bath at a Japanese style hotel, at Hakone-machi, Ashigara-shimo county, Kanagawa prefecture
Construction period: about 4 months
Construction details: We executed a big bath repair and recovery construction, due to old and deteriorated.
For hotel using customers to spend more safely with ease, we executed「big bath」repair and recovery construction.
In the first place, we executed temporal partitioning construction at the site, and let it invisible.
Next, we are explaining the base bedding.
We assemble and mount LGS (=light gauge steel) on the base bedding.
The places which we mount LGS are ceiling and wall.
After mounting LGS base bedding, we must not use inconspicuous plywood sticking or use calcium silicate board.
For sticking base bedding, we use water resisting plywood.
After finish sticking plywood, we stick moisture-proof sheet and waterproof tape.
Without sticking them, it may make trouble with too much moisture or so, so we stick them firmly and secure airtightness.
The followings are construction site pictures.
They are the pictures after finish sticking moisture-proof sheet (Barrier ace).
We measure the level, height, width and so on with laser distance measuring instrument.
After embedding fitting frame and other work operation, we secure airtightness with waterproofing tape.
By using this bath panel, we stick it with small screw on the ceiling and wall.
These pictures are just after sticking bath panel.
It looks like hot spring will come out and stream from here.
Finally, a whole picture after bath panel construction, and an extra of food with dish picture, which also seemed to be very tasty too.
The following picture is after our construction has finished, which is quoted from the hotel website page.
We can see that hot spring coming to this big bath makes a stylish finishing, can’t we?
Then, that is all for our explanation of bath panel.
If you are considering to request our construction of warm-bathing facility, big bath, hotel, Spa, public bath and so on, please talk with us light heartedly in the first place.
We are taking charge and handing various relative requirements, such as new opening, renewal construction, repair and recovery work, and so on.
So, please contact and give us your counselling light heartedly,
Finally,
As construction cost greatly differs according to each contractor, we recommend you to obtain【plural competitive quotations】.
In the first place, please compare each quotation, and we would like to request you to place your order to us hopefully.
From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves.
We are supplying「reasonable construction work as much as possible, and high quality, better work service」to our customers.
On《office・shop or store(tenant)》renewal work・redecoration work
recovery work(reform work)・original state recovery and restoration work, from partly repair work to full set of interior decorative construction,
we are receiving and executing your order.
Kindly give us your inquiry light heartedly in the first place.
We are waiting for your contact.
We are also sometimes updating SNS social media.
We are also waiting for your follow・it is good♡ by all means.
~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~
★If you look for an interior decorative construction contractor
at Ikebukuro, it is Kikuchi Souken Co., Ltd.★
★If you also look for original state recovery an restoration construction in Tokyo,
it is Kikuchi Souken Co.,Ltd.★
Address: 〒171-0014
4th floor, Musashiya No.3 Building,
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo
Phone: 03-5985-4252
~~~~~~~INTERIOR DECORATIVE CONSTRUCTION CONTRACTOR~~~~~~~