On hat joint construction work│ Also with construction work site sample
- 2023.02.13
Hello, everyone! This is Kikuchi Souken Company Limited website.
Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of《Interior decorative construction work》generally and《Recovery and restoration construction work》for you.
This time, we are roughly explaining hat joint construction work.
It is the latest version article which we also introduced before.
https://kikusou-gr.com/wp/%e3%83%8f%e3%83%83%e3%83%88%e7%9b%ae%e5%9c%b0%e6%96%bd%e5%b7%a5/
As many of you probably wonder what on earth is hat joint?
So, we are briefly explaining it in this article at first.
If you do not need to read that explanation, and would like to see our construction work situation, then please directly visit and see the subtitle of「Hat joint construction work situation」below.
In the first place, What is joint?
Firstly, besides gypsum board which we are explaining this time, joint is pointed to be a gap arising between construction materials such as tile, stone materials and so on.
You may possibly have seen「 cauking 」was done between bricks at that mesh patterned joint between bricks and in the toilet or wet area.
As we above-mentioned, depending on materials, joint is cauked, is thrusted and filled with putty and so on, or joint materials such as joiner is embedded.
The work, Joiner seems to have the nuance of「 tying thing」.
The reason why we treat joint.
The reason why we treat joint varies a lot depending on the places and part materials. The biggest and main reason and role can be probably said「 Cutting the edge, and preventing each material from interfering and wearing. 」
Depending on the temperature and humidity, there is a possibility of materials occurring shrinking, crooking and so on.
Furthermore, because of external factors such as earthquake and so on, materials may also occur to be pushed out or pulled in toward all the direction.
Therefore, by taking joint a little widely or so, chances are that it is often executed constructing work to be able to buffered。
As for other purpose, there is an addition of decorativeness.
The joiner which we are introducing this time is a kind of joint material(changeoff material) 「which can make joint to finish with a certain interval」.
By inserting and sticking joint, there is a merit of preventing it from interfering materials each other, while making materials appear neatly.
There are various kinds of joiners. Comparing with the case of simply embedding calking, it can make a good joint in appearance.
Component materials used at different finishing places each other such as joiners, or component materials to be used at constructing different direction parts crossed such as ceiling and wall part are called 「changeoff material」.
We may be also going to introduce other changeoff materials later.
Hat joint construction work situation
Our introductory remark may have been long so far, however, we are explaining the situations of hat joint construction work site at a certain office warehouse from here.
Because the picture is taken as slightly going down, it may not be very clear, please pay close attention to the worker’s hand.
Rather larger joint than usually was being made in the horizontal direction. We are going to insert 「hat joiner 」in this gap.
As the joint cross section looks like silk hat, it is called hat joiner.
The purpose of inserting joiner this time is「Upper part by painting, and lower part by so- called decorative cross finishing, cutting the edge is recommended.」.
As above-mentioned, in the case of mutual materials, especially in the case that the material and the finishing or so are different, we can say that「cutting the edge」construction work is indispensable.
By cutting the edge, we can reduce what to affect painting or sticking so-called decorative cloth for external factors such as humidity, earthquake and so on.
In this connection, hat joiner is also used for outside wall part joint, besides interior decoration.
(The joiner for outside wall use is different from that of interior decorative use on size and material very much. )
When embedding joiner, we go on sticking at the back side of joiner with glue.
At this time, in order not to leave too much glue, and in order to be able to stick firmly, we carefully go on executing construction work.
If leaving too much thickness, when finishing putty treatment, it is getting hard to flatten it, and it will take time for adjusting it.
Because it is going to be hard to adjust it by work operation as time goes on, the first step is crucial.
The direct above picture is the situation of already finish gluing hat joiner generally.
After this, same as the mutual gypsum boards joint and the screw fixing place, we do putty treatment. After that, when sticking so-called decorative cloth and painting, we adjust not to arise floating or 凹, and we actually transfer the work site to the following painting・sticking so-called decorative cloth construction work process, then our work is finished.
Summary
We so far roughly explained hat joint construction work about the joint construction work itself, and the actual construction work situation as above.
As this time, in the case of different finishing at the upper part and lower part or so, 「cutting the edge 」of joiner and executing construction work of changeoff material happen to be often.
Upon your request, it is certainly possible for us to execute the relative construction work.
Besides, if you happen to have questions・counselling and so on such as「At the place like this, how should I request construction work?」, please be sure to talk with us light heartedly.
It is possible for us to answer for the . whole process, and part of the process construction work too. So, we are waiting for your relative inquiry.
Finally,
From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves. Our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.
As construction work cost often differs very much according to work contractors, so we recommend you to compare plural quotation prices.
Comparing our quotation with others, please be sure to consider your order to us.
On 《office・shop or store(tenant)》 renewal work・redecoration work(reform work)・recovery and restoration work, we are glad to receive your construction work request from partly mending and repair work to full set of interior decorative work.
Please give us your inquiry light heartedly in the first place, as we are heartily waiting for your contact to us.
https://kikusou-gr.com/wp/contact/
Three colored clicking marks: Instagram, Twitter, Facebook.
Please light heartedly click icons, follow is also nice♡!
~~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~~
★Interior decorative construction work contractor at Ikebukuro★
★Recovery and restoration work・full set of interior decorative work・office relocation★
Kikuchi Souken Co., Ltd.
〒171-0014
Address:
4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo
Phone: 03-5985-4252
~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~