Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are an interior decorative work contractor mainly executing《Interior decorative construction work》generally《Recovery and restoration construction work》for you.

 

 

 

Variety goods store│new decorative construction work at a commercial facility tenant

We are explaining this time is, a construction work site at a tenant of commercial facility in Ikebukuro.

 

The contents of new decorative construction work is, a construction work for variety goods store.

In the event of opening a variety goods store, we will execute design interior decorative work whose level does not spoil the image of selling variety goods. We hear that this variety goods store describes an image of luxurious tropical country.

 

Then, we are simply explaining flows from construction work request to construction work start.

 

 

 

<Flowing of variety goods store interior decorative construction work >

  • ・Considering the image of variety goods store interior decorative image, based on its concept.
  • ・Making simple layout chart from its image.
  • ・Requesting quotation to interior decorative work contractors.
  • ・Asking the possible interior decorative work contractors to make the drawing, with reference to the layout chart.
  • ・If you agree on the construction work details・price, then requesting the actual construction work to the contractor.
  • ・Starting interior decorative construction work(commencement of work).
  • ・Final checking prior to construction work completion.

 

Above is a simple flowing of variety goods store interior decorative construction work.

 

 

 

Variety goods store│new decorative construction work│content details

 

Construction work kind: new decorative work (tenant work)

Construction work site: second floor at Tobu Department store, 1-25, 1-chome, Nishi-Ikebukuro, Toshima ward, Tokyo

 

Construction work content details:

 

Succeeding the former tenant as the former decorative furnished situation, we strip existing so-called decorative cloth and board. We executed LGS(=light gauge steel) work, board finishing work, hole filling work operation by adjusting ceiling light lighting quantum, doing putty treatment work operation, fitting fixture (frame) work operation, sticking so-caller decorative cloth, and so on.

We briefly treat work where to be able to succeed as it is.

 

We are explaining work details together with construction work site pictures as follows.

既存の壁に貼ってあるクロスを剥がします。

We strip so-called decorative cloth sticked on the existing wall.

 

 

 

既存の壁を利用するため壁に穴を開ける箇所に下書きをして、正確に長方形の穴を開けます。

As we will use the existing wall, we write down a draft where to open a hole, and open a rectangle hole precisely.

 

 

LGS work

LGS work is, a kind of construction work of installing ceiling and floor bedding material, in order to divide space, at the office・shop or store・commercial facility and so on. We use thin steel made material.

As it is different from wooden material, it is durable against water and humidity. Therefore, as it is free from worrying about burning down too, it is often used at the present interior decorative work site.

Its construction work place can be mainly pointed out to be, ceiling and wall framework or structure. This time, it is used to divide space.

 

Features of LGS are,

 

  • 【It can satisfy fireproof standard, comparing with wood.】
  • 【It can shorten construction work period.】
  • 【Its construction work unit price is low.】and so on.

 

There are variousof merits, so it is becoming a mainstream for the present interior decorative construction work.

 

 

空間(スペース)を区切るためにLGS(軽量鉄骨)で仕切っております。

We use LGS to divide the space.

 

 

 

Board finishing construction work

Board work is, a kind of so-called decorative cloth bedding work at the ceiling and wall.

Specifically, it is an execution work of going on sticking gypsum board(plaster board) on the wall and ceiling.

 

Gypsum board used for bedding is assumed as a role such as,

  • 【Thermal insulation】
  • 【Sound isolation】
  • 【Fire resisting】

 

Depending on execution method, there are wide varieties of functions and kinds of (double sticking and the like).

On board, please refer to our following site page article.

[Interior decorative work━board work] On gypsum board, explaining again.

https://kikusou-gr.com/wp/board-work/

 

 

 

 

 

 

Fixture work

Fixture work is, a kind of construction work to fit partition to be able to open and close at the construction open part.

It is mainly used as wall door and window.

As the usage of executing fixture work, there are purposes and usages of entrance, air vent, lighting, sound insulation, crime prevention and so on. Various types of fixtures are installed.

The following construction work picture is under curing after fitting fixture.

We are well protecting not to let materials scatter or not to let tools touch to make dirty or damage during work operation.

Please visit here as reference → curing materials

 

扉に建具を取り付け後

After fitting fixture to the door.

 

養生材を施工中

Under construction work of curing material.

 

 

 

We fill hole vacancy work operation to reduce lightings which the former tenant used.

 

Because of the store design, some of the existing lightings are used as they are. In order to reduce light quantum, we take off certain lighting equipment, and cut board to match the size of former lighting equipment hole. Then, we fill the board to hammer screw into framework.

 

 

 

 

 

After finishing all the place of board work(bedding) process, we do putty treatment at the board gap.-

If we would not carry out putty treatment here, we could not stick so-called decorative cloth (wall paper) neatly.

After embedding the gap, we go on moving to work operation of sticking so-called decorative cloth.

Above these are all of the construction work site pictures this time.

On putty treatment, please refer here.

[Interior decorative construction work  Term series] On putty treatment.

 

https://kikusou-gr.com/wp/board-work/

 

 

 

Summary

This time, we explained a construction work example of variety goods store as above.

 

By executing construction work with properly using former tenant decorative furnished situation, it is possible to reduce construction work cost markedly too, by succeeding usable places as they are, and by getting rid of where is not used.

 

If you are considering to request interior decorative work with a property of former partly usable decorative furnished situation, please be sure to talk with us light heartedly by all means.

 

 

 

Finally.

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves, so our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

Please do not hesitate to compare our quotation with other plural possible contractors’, as we welcome your comparing competitive quotations.

 

「Which construction work contractor should I request? How much is approximate construction work cost? and so on.」

 

 

《On office・shop or store(tenant) 》renewal work・redecoration work・repair work(reform work)・recovery and restoration work, small scale repair interior decorative work and so on, please give us your inquiry in the first place light heartedly, as we are waiting for your contact to us.

 

https://kikusou-gr.com/wp/contact/

 

Instagram     Twitter    Facebook    

 

Three colored clicking marks: Instagram, Twitter, Facebook.

Kindly click following is nice♡ too light heartedly.

 

~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~

★If you look for interior decorative work contractor at Ikebukuro,it is Kikuti Soken Co.Ltd★

★If you also look for recovery and restoration work in Tokyo, it is Kikuchi Souken Co. Ltd★

 

Phone: 03-5985-4252

~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~

 

 

Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, and in all over Kanto district, we are taking charge of《Interior decorative construction work》generally and《Recovery and restoration construction work》for you.

 

This time, we are roughly explaining hat joint construction work.

 

It is the latest version article which we also introduced before.

 

Hat joint construction work

https://kikusou-gr.com/wp/%e3%83%8f%e3%83%83%e3%83%88%e7%9b%ae%e5%9c%b0%e6%96%bd%e5%b7%a5/

 

As many of you probably wonder what on earth is hat joint?
So, we are briefly explaining it in this article at first.

 

If you do not need to read that explanation, and would like to see our construction work situation, then please directly visit and see the subtitle of「Hat joint construction work situation」below.

 

 

In the first place, What is joint?

 

Firstly, besides gypsum board which we are explaining this time, joint is pointed to be a gap arising between construction materials such as tile, stone materials and so on.

 

You may possibly have seen「 cauking 」was done between bricks at that mesh patterned joint between bricks and in the toilet or wet area.

 

 

As we above-mentioned, depending on materials, joint is cauked, is thrusted and filled with putty and so on, or joint materials such as joiner is embedded.

 

The work, Joiner seems to have the nuance of「 tying thing」.

 

 

The reason why we treat joint.

 

The reason why we treat joint varies a lot depending on the places and part materials. The biggest and main reason and role can be probably said「 Cutting the edge, and preventing each material from interfering and wearing. 」

 

 

Depending on the temperature and humidity, there is a possibility of materials occurring shrinking, crooking and so on.

 

Furthermore, because of external factors such as earthquake and so on, materials may also occur to be pushed out or pulled in toward all the direction.

 

Therefore, by taking joint a little widely or so, chances are that it is often executed constructing work to be able to buffered。

As for other purpose, there is an addition of decorativeness.

 

The joiner which we are introducing this time is a kind of joint material(changeoff material) 「which can make joint to finish with a certain interval」.

By inserting and sticking joint, there is a merit of preventing it from interfering materials each other, while making materials appear neatly.

 

There are various kinds of joiners. Comparing with the case of simply embedding calking, it can make a good joint in appearance.

 

Component materials used at different finishing places each other such as joiners, or component materials to be used at constructing different direction parts crossed such as ceiling and wall part are called 「changeoff material」.

 

We may be also going to introduce other changeoff materials later.

 

 

Hat joint construction work situation

 

Our introductory remark may have been long so far, however, we are explaining the situations of hat joint construction work site at a certain office warehouse from here.

 

 

ハットジョイナー施工中の様子

Actually just under executing joiner situation.
In order to execute joiner, the joint is taken out rather largely than vertical direction boards’ joint each other.

 

 

 

Because the picture is taken as slightly going down, it may not be very clear, please pay close attention to the worker’s hand.

 

Rather larger joint than usually was being made in the horizontal direction. We are going to insert 「hat joiner 」in this gap.

 

As the joint cross section looks like silk hat, it is called hat joiner.

 

The purpose of inserting joiner this time is「Upper part by painting, and lower part by so- called decorative cross finishing, cutting the edge is recommended.」.

 

As above-mentioned, in the case of mutual materials, especially in the case that the material and the finishing or so are different, we can say that「cutting the edge」construction work is indispensable.

 

By cutting the edge, we can reduce what to affect painting or sticking so-called decorative cloth for external factors such as humidity, earthquake and so on.

 

In this connection, hat joiner is also used for outside wall part joint, besides interior decoration.

(The joiner for outside wall use is different from that of interior decorative use on size and material very much. )

 

 

 

 

 

ハットジョイナー近接画像

Hat joiner close-up picture(As we lost the original picture data, the company logo is the former one, sorry!)

 

 

 

 

 

When embedding joiner, we go on sticking at the back side of joiner with glue.

 

At this time, in order not to leave too much glue, and in order to be able to stick firmly, we carefully go on executing construction work.

 

If leaving too much thickness, when finishing putty treatment, it is getting hard to flatten it, and it will take time for adjusting it.

 

Because it is going to be hard to adjust it by work operation as time goes on, the first step is crucial.

 

 

 

 

ジョイナー糊付け施工完了時の様子

Finish gluing hat joiner situation.
After this, we do patty treatment again. We go on adjusting the bedding to flatten gypsum board surface.

 

 

 

The direct above picture is the situation of already finish gluing hat joiner generally.

 

After this, same as the mutual gypsum boards joint and the screw fixing place, we do putty treatment. After that, when sticking so-called decorative cloth and painting, we adjust not to arise floating or 凹, and we actually transfer the work site to the following painting・sticking so-called decorative cloth construction work process, then our work is finished.

 

 

 

 

Summary

 

We so far roughly explained hat joint construction work about the joint construction work itself, and the actual construction work situation as above.

 

As this time, in the case of different finishing at the upper part and lower part or so, 「cutting the edge 」of joiner and executing construction work of changeoff material happen to be often.

 

Upon your request, it is certainly possible for us to execute the relative construction work.

 

Besides, if you happen to have questions・counselling and so on such as「At the place like this, how should I request construction work?」, please be sure to talk with us light heartedly.

 

It is possible for us to answer for the . whole process, and part of the process construction work too. So, we are waiting for your relative inquiry.

 

 

 

 

 

 

Finally,

 

From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves. Our aim is supplying 「reasonable construction work as much as possible, and high quality, better work service」to our customers.

 

As construction work cost often differs very much according to work contractors, so we recommend you to compare plural quotation prices.

 

Comparing our quotation with others, please be sure to consider your order to us.

 

On 《office・shop or store(tenant)》 renewal work・redecoration work(reform work)・recovery and restoration work, we are glad to receive your construction work request from partly mending and repair work to full set of interior decorative work.

Please give us your inquiry light heartedly in the first place, as we are heartily waiting for your contact to us.

 

https://kikusou-gr.com/wp/contact/

 

 

 

 

Instagram     Twitter   Facebook  

Three colored clicking marks: Instagram, Twitter, Facebook.

Please light heartedly click icons, follow is also nice♡!

~~~~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~~~

★Interior decorative construction work contractor at Ikebukuro★

★Recovery and restoration work・full set of interior decorative work・office relocation★

Kikuchi Souken Co., Ltd.

〒171-0014

Address:

4th floor, Musashiya No.3 building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone: 03-5985-4252

~~~~~~~~~~~Interior decorative construction work contractor~~~~~~~~~~~

 

 

Hello, everyone! This is Kikuchi Souken Company Limited website.

Our company office is based at Ikebukuro, Toshima ward, Tokyo, in all over Kanto area, executing in charge of all of《 Interior decorative construction work 》《 Recovery and restoration construction work 》for you.

 

This time, we are roughly explaining recovery and restoration construction work which will occur in its construction work, which our company is also good at.

 

If you should have a plan to request relative construction work or should be considering it, we are happy if you read this article.

 

Last time, we wrote and uploaded 「points to be noted and checked when requesting recovery and restoration work」.

If you are not yet very clear on recovery and restoration construction work after all, or would like to know points to be noted, we are happy if you read this article together (Sorry, but, if you understand Japanese, please read the relative Japanese website in this article here. Otherwise, please disregard here.)

 

 

An example occurring in recovery and restoration construction work.

 

As we explained in our article last time, scope of recovery and restoration construction work varies much depending on properties.

 

Therefore, we are introducing work operation・construction work generally occurring at the office , and explaining its contents briefly.

 

  • Moving out and removing of equipment, household goods (remaining goods)
  • Changing lighting (removing existing goods)
  • Removing partition, fixture thing
  • Re-sticking of so-called wall cloth (ceiling also if necessary)
  • Demolition・removing wall, ceiling material
  • Re-sticking floor, or removing it
  • Changing and restoring equipment
  • Removing wiring, piping(electricity・gas・internet)
  • Cleaning air-conditioner, other work operation

 

 

 

Moving out and removing of equipment, household goods (remaining goods)

 

Picture of the site preparing to take out and to move out all of air-conditioner and lighting for big scale repairing, not recovery and restoration work site

Picture of the site preparing to take out and to move out all of air-conditioner and lighting for big scale repairing, not recovery and restoration work site

 

 

In the first place, we are removing・shifting equipment, household goods, and remaining things.

 

If it is property administrator’s equipment, checking first what kind of contract it. Then, if you are removing it, moving it out. If the remaining is assigned, then we will move it temporarily, and cure it for not to hurt it.

If it is resident’s (customer’s) equipment or household goods, when leaving out, all should be removed naturally.

 

For that sake, in the previous step meeting before starting main construction work, interior decorative work company should ask the customer to sort which to be demolished・removed・shifted by the former company, and which to be done by the latter customer. When we start executing, we do relative work operation accordingly.

 

In that occasion, in order to prevent entrance and goods moving in and out route from hurting or making it dirty, we do curing.

 

If the distant to tenant or neighboring is close, we will also especially take measures of sound insulation・ dust proofing.

 

Picture of curing before construction work. At the floor part, covering blue sheet for preventing from hurting, making dirty. At the left wall part, masker curing for preventing from splashing dirt.

Picture of curing before construction work. At the floor part, covering blue sheet for preventing from hurting, making dirty. At the left wall part, masker curing for preventing from splashing dirt.

 

 

 

Changing lighting (removing existing goods)

 

It is not necessary for normal resident, however, in the case of office and shop or store, it seems that changing of lighting is regarded indispensable in many cases.

 

For a general office, all the lighting should be changed to new one.

 

 

 

 

Removing partition, fixture thing

 

If there is newly added partition or fixture goods when moving into the property, it is necessary to return to the original situation before moving out.

 

Conversely, before leaving out, it is also often required to do construction work making into original situation.

 

It is the process for demolition work contractors and we interior decorative companies are always going to be necessary to do.

 

 

 

Re-sticking of so-called wall cloth (ceiling also if necessary)

 

 

In the case of general resident, unless there occurs hurting on purpose, re-sticking obligation will not happen to be necessary.

However, in the case of shop or store, office and so on, such as business use properties, it is often necessary to re-stick so-called wall cloth.

 

However, for example, the place to be required re-sticking when dirt or abrasion is seen, because of smoking stain or so, re-sticking at the ceiling part will be often required to be necessary too.

 

Not only about so-called cloth re-sticking, for deciding whether a certain place should be executed construction work or not, we recommend you to discuss in advance with contractors・property administrators well and to check at all times.

 

 

 

Demolition ・ removing wall, ceiling material

 

In the case of so-called skeleton situation returning property, renters sometimes have to also demolish ・remove all the wall ・ceiling other than partition wall which we installed before.

 

Depending on properties, we sometimes have to further demolish ・remove doors and glasses and others too.

 

 

Situation of center partition part demolition for recovery and restoration work. Continuing board material, heat insulating material is ripped off and piled up. We all removed wall bedding part at last too.

Situation of center partition part demolition for recovery and restoration work. Continuing board material, heat insulating material is ripped off and piled up. We all removed wall bedding part at last too.

 

 

 

Floor re-sticking, or removing

 

Depending on requirements, we re-stick or remove the floor.

 

In usual recovery and restoration work, we change all the floor into new one.

If the floor is tile carpet, we re-stick it. If it is long length PVC sheeting, we change it into a similar grade material.

 

If the requirement is already mentioned skeleton situation returning, we remove all the floor material after all, and bare the body.

 

 

 

 

Changing and recovering equipment

 

As for restaurants, offices, it is often exchanged in the relative contract on how to return or change the equipment minutely.

「Returning after doing enough maintenance and cleaning」

「Changing into new one」

「If it is a lease item, then inquiring the rental company」

Above and others, there are wide variety of items.

 

It seems that before moving into the property, it is also fixed minutely, however, all above can be said that they are items which needs reconfirming.

 

 

Removing wiring, piping (electricity ・ gas ・ internet)

 

On wiring, piping too, depending on scope of recovery and restoration work, there are a lot of varieties.

Basically, they all are the items which are desirable for diversion.

However, if the property owner requires, removing, removing will be done based on the meeting.

 

If continuing to use former decorative property or so, in the case of handing the present situation to the next renter as the similar kind building, there is a situation too not by removing it but by changing it or do maintenance only.

 

 

 

Cleaning air-conditioner, other cleaning work operation

 

Cleaning similarly or more neatly than before moving out is often required for business use properties. In the case of air-conditioner cleaning, it is also one of the requirements often.

 

In addition, let alone cleaning and washing after demolition of construction work, including newly changed places, the whole cleaning is also required in a lot of cases.

 

An example of above is, waxing on the flooring material or so.

 

 

 

Summary

 

We so far explained work operation and construction work which may lead to occur in recovery and restoration work.

 

Recovery and restoration construction work is, when business people or company is associated with leaving (or moving out), returning withdrawal property to the original situation.

 

Even if small office and shop or store, a lot of work contents and items to be checked will occur, so we recommend you to check what kind of work operation for those company who gave you relative quotation is good at, or how far it is possible to work.

 

If you happen to have uneasy points or matters to consult after reading this blog, please be sure to give us your inquiry light heartedly.

And, naturally, as there are in our article, if you request relative quotations, we welcome your comparing other obtained quotations with ours too.

 

We consider that by understanding relative costs, conditions and others well, and ll requesting to our company in comfortable situation will be good for you.

 

The other days, we wrote in our blog「on price inexpensiveness」in the case of your requesting recovery and restoration construction work to our company.

 

We will be grateful if you also read it together with this.

 

About others, If you have any request on interior decorative construction work, please be sure to consult with our company by all means.

 

Concerning whole interior decorative construction work too, please give us your inquiry light heartedly.

 

At last,

 

From price quotation up to construction finishing work completion, our company is directly managing and doing actual construction work by ourselves, So we are supplying high quality good work products with「more reasonable and low price」 to you.

 

Therefore, by comparing our offer price with other plural ones without hesitation.

We welcome your comparing offer prices.

「How much is approximate construction work price?」

「How are you going to do work at this part?」and so on.

As for your counselling request・inquiry and so on, please contact us light heartedly.

 

 

On office renewal, shop or store renovation・recovery and restoration work・reform work (interior decorative construction work) and so on, please give us your inquiry in the first place.

We are waiting for your contact to us.

https://kikusou-gr.com/wp/contact/

 

 

Followings are our SNS links which our company is managing.

 

Instagram     Twitter   Facebook  

 

We are waiting for your follow・I like it!

 

 

~~~~~~~~~~~~~~~~~~~~~~Ikebukuro~~~~~~~~~~~~~~~~~~~~~

★Interior decorative construction work company in Ikebukuro★

★Recovery and ,restoration work・full set of interior decorative construction work・office relocation★

 

〒171-0014

Address: 4th floor, Musashiya No.3 Building, 62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo

Phone: 03-5985-4252

~~~~~~~~~~~~~INTERIOR DECORATIVE FINIHING COMPANY~~~~~~~~~~~~~~