At this time, we thank you so much for browsing『 Kikuchi Souken Co.,Ltd. 』homepage.
Having been setting up our company office at Ikebukuro, Toshima ward, Tokyo, in all over Japan,
we are an
『Interior decorative construction contractor (interior decorative work company) 』
taking charge of full set of
『Interior decorative construction』・『Original state recovery and restoration work』.
We are introducing and explaining worker list among the safety documents this time.
Interior decorative work is an important work operation of re-decorating buildings and the space, mending, and customizing.
At the same time, there exits various dangerous factors in this work.
In order to ensure worker safety and to realize effective safe management, various safety documents are indispensable to be required.
Among them,「worker list」plays an important role.
In this blog, we are explaining its detailed role and importance in interior decorative work minutely.
What is worker list?
Worker list is, a kind of detailed list of all the workers who work at the interior decorative site.
This list includes each worker’s name, contact information, title, professional field, work permit information, safety training received history and so on.
Worker list always reflects the newest information from the start of work up to the completion, and it is revised as required.
The role and importance of worker list
1. Identification and communication with the worker
Worker list clearly identifies each the worker working at the work site, and supplies basic information to contact with.
With this list, it is easy to contact with and to communicate effectively in an emergency condition.
Identifying the worker in an appropriate way will improve the work site efficiency and security.
2. Trace of safety management and receiving training
Worker list is used for recording worker safety training received history.
It is a precious tool to check if each worker received the necessary training, and if executed the work by safe method.
The worker who received safety training can facilitate to limit his or her risk to the minimum level at the work site.
3. Observance of labor law
Worker list also includes the information of work permit concerning legal requirement and so on.
With this list, observance of labor law and regulation is secured, and the legal risk is reduced.
If the workers have the appropriate qualifications and observe legal requirement, then reliability of the project is enhanced.
4. Corresponding in the case of emergency
Worker list is also useful for corresponding in emergency.
In the case of occurring accident or disaster, it makes an useful information source to secure the location and safety of the worker.
It is indispensable to be able to use the location and contact information with the worker.
5. Progress management of the project
Worker list is also useful for the progress management of the project.
It can be utilized for grasping each worker’s role and professional knowledge, and for assigning the task and adjusting schedule.
With this, it is possible to proceed the project as scheduled, and to complete it efficiently.
Summary
Worker list is an indispensable tool for safety management and effective progress of the project in interior decorative work.
It plays an important role on many aspects such as identification of the worker, trace of received training, observance of legal requirement, corresponding in an emergency, project management and so on.
In order to realize interior decorative work safety and success, the appropriate management and renewal of worker list are necessary.
Let’s maintain safe work site!
Our recommendable blog:
What is recovery and repair construction work? On difference from renovation work.
※Please understand that we will execute construction in Japan only.
Finally,
The construction costs are greatly different according to work contractors,
so we recommend you to get【plural competitive quotations】.
Please compare the quotations from the companies in the first place, and consider to give us your order by all means.
From price quotation up to construction work completion, our company is directly managing and doing construction work by ourselves.
So, we are supplying「reasonable construction work as much as possible, and high quality, better work service」to our customers.
On 《office・shop or store(property tenant)》 renewal work
・redecoration work(renovation work)
・recovery and restoration work,
we are glad to receive your construction work request from partly mending and repair work to full set of interior decorative work.
Please give us your inquiry light heartedly in the first place, as we are heartily waiting for your contact to us.
We are sometimes updating SNS social media too.
We are waiting for your follow, it is good♡ by all means!
~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~
★If you look for an interior decorative construction contractor
at Ikebukuro, it is Kikuchi Souken Co., Ltd.★
★If you also look for original state recovery an restoration construction in Tokyo,
it is Kikuchi Souken Co.,Ltd.★
Address: 〒171-0014
4th floor, Musashiya No.3 Building,
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo
Phone: 03-5985-4252
~~~~~~~INTERIOR DECORATIVE CONSTRUCTION CONTRACTOR~~~~~~~
Japanese blog
At this time, we thank you very much for browsing『Kikuchi Souken Co.,Ltd.』home page.
Having been setting up our company office at Ikebukuro, Toshima ward, Tokyo, in all over Japan,
we are an『Interior decorative construction contractor (interior decorative work company)』
taking charge of full set of 『Interior decorative construction』・『Original state recovery and restoration work』.
This time, in what we executed construction site in the past, we are explaining an example of fukashi wall construction.
While briefly explaining fukashi wall, we will also introduce it with actual site pictures.
What is fukashi wall?
深紙壁とは、既設の壁面に、パネルシリーズ建材を貼り合わせたり、軽量ゲージの鋼材や木材で下地寝具を組み立てて取り付けたり、さらにその上にボード材を施工したり、これを「追加」壁といえます。
We mainly often mean the latter「assembling and mounting base bedding, and constructing board material, then adding」wall as fukashi wall.
We are explaining what kind of merits・demerits there are as a result of constructing fukashi wall.
Purpose of constructing fukashi wall, and merits
・In addition to the existing wall, as it strengthens base bedding and board, heat insulating property and sound insulating property can be enhanced.
・It becomes the protection of piping and wiring.
・It enhances designability.
By combining it with lighting shade and shadow, or niche wall, it can also make shelves.
In addition to the existing wall, as it strengthens base bedding and board, heat insulating property and sound insulating property are enhanced.
As for concrete building body too, even if there is some wall already,
it is possible to construct fukashi wall.
By assembling and mounting base bedding, then sticking board material, heat insulating property and sound insulating property are enhanced, so the wall faced with outer wall is particularly often constructed.
Besides, as it becomes thicker according to mounting base bedding too, so by filling in heat insulating material such as glass wool and so on, it can further enhance heat insulating property and sound insulating property.

The picture of filling in heat insulating material after assembling and mounting building body wall, or existing wall on the base bedding. Heat insulating property and sound insulating property are duly enhanced.
The above picture is the situation of filling in heat insulating material on the wall surface and in the ceiling at a sports facility.
By assembling and mounting light gauge steel ceiling base bedding on the existing wall, it becomes thicker, so the heat insulating property and sound insulating property are enhanced.
It becomes the protection of piping and wiring.
Not only at the ceiling, but also on the wall surface, there are a lot of wiring・piping too. Routing and lying those on the wall is not good visually and from protection viewpoint too usually.
Putting them along the wall is not good visually and from the protection viewpoint.
By mounting base bedding and becoming thick, it is possible to hide big wiring too.
In the case of particularly increased facility which requires wiring afterwards, by making fukashi wall and hiding wiring inside, as it can make the wall neat and clear. So, when executing re-decorative construction, we are sometimes requested to do this too.
Incidentally, at the upper part shelf of men’s public toilets, the back face of toilet seat at a general residence, and the space which is likely to be able toplace goods at the side face, fukashi wall part is often adopted for protecting piping.
The above is a picture of fukashi wall constructed for piping protection.
The pipe thickness is only accordingly added than usual wall thickness.

This picture is not a fukashi wall to be exact, but a partition wall. Similarly, the picture is the situation where wiring is gone through and protected born in the thickness of light gauge steel base bedding. (Right part of the picture)
It enhances designability.
By combining it with lighting shade and shadow, or niche wall, it can also make shelves.
Niche wall is pointed to be, a kind of wall which sidesteps building body and palls from present state wall , and occurring 凹 state.(It is an opposite term of fukashi wall)
By taking advantage of the wall 凹凸, the expression will come out.
By making shelves for storage, or arranging lightings, it is also possible to execute to construct the wall which shines the backlight.
Chances are that at a general residence, you may see shelves already fit at the upper part of a kitchen, TV stands constructed just like adding existing wall, or decorative shelves.
Those can be said a fukashi wall.
Demerits arising from constructing fukashi wall afterwards.
The most often raised demerit to be pointed resulting from constructing fukashi wall, according to its wall thickness is, the space duly becomes small.
Particularly, different from fukashi wall or so for piping protection, at a general residence, when you would like to re-decorate by newly installing decorative shelves, there may be a possibility of increasing more oppressive feeling than being at the original space, then furniture and others may not be well placed.
If you should construct fukashi wall by yourself, please be careful if you do not happen to construct on「a wall which is playing an important role structurally」.
By carelessly hurting wall or base bedding material, it may be considered that the wall should become lacking of strength, deteriorating moisture-proof performance or water resisting performance.
Besides, there may be also considered to be a problem of lacking of strength where there is not any base bedding, so the wall cannot be fixed.
On these things, probably, by taking counsel with or requesting professional constructors or requesting professional skilled construction workers, you may be able to prevent from occurring problem.
Incidentally,
Adding overhang on the wall is written as「fukashi (wall)」,while indenting is written as 「niche (wall)」as above.
Making a ceiling overhanging step like finishing is called「clipped ceiling」, while indenting a step is called「folded ceiling」.
As ceiling is an important part of interior too, it seems that these above terms may be worth memorizing.
Summary
We so far explained what is fukashi wall, its features, and merits, demerits.
For us an interior decorative construction contractor, for the purpose of piping protection and filling in heat insulating material, even if there is not designability, in fact we are often executing fukashi wall construction.
However, after reading this article this time, if you would like to request to「newly make and install a storage place on the shelf」,「would like to talk with us for requiring to make a little accent」,「as the room is cold, would like to fill in heat insulating material」, and so on, we are naturally glad to correspond to these.
Regardless of big or small construction size,, kindly give us your inquiry light heartedly.
・fukashi wall is, a kind of wall based on the existing protruded wall,by mounting base bedding material on the panel.
・It is mainly executed for enhancing piping・wiring protection, sound insulating performance, and sound insulating performance.
・It is also possible to execute interior decoration which has the designability of shelves and lighting, by taking advantage of wall 凹凸.
※Please understand that we will execute construction in Japan only.
Finally,
From price quotation to construction work completion, our company is directly managing and doing construction work by ourselves.
So, we are supplying「reasonable construction work as much as possible, and high quality, better work service」to our customers.
Please do not hesitate to compare our quotation with other plural ones.
We also welcome other competitive quotations.
「How much is the approximate cost? How to execute construction of this part?」and so on, please take counsel wit us・give us your inquiry light heartedly!
On 《office・shop or store(property tenant)》 renewal work
・redecoration work(renovation work)
・recovery and restoration work,
we are glad to receive your construction work request from partly mending and repair work to full set of interior decorative work.
Please give us your inquiry light heartedly in the first place, as we are heartily waiting for your contact to us.
We are sometimes updating SNS social media too.
We are waiting for your follow, it is good♡ by all means!
~~~~~~~~~~~~~~~~~~IKEBUKURO~~~~~~~~~~~~~~~~~~~
★If you look for an interior decorative construction contractor
at Ikebukuro, it is Kikuchi Souken Co., Ltd.★
★If you also look for original state recovery an restoration construction in Tokyo,
it is Kikuchi Souken Co.,Ltd.★
Address: 〒171-0014
4th floor, Musashiya No.3 Building,
62-10, 2-chome, Ikebukuro, Toshima ward, Tokyo
Phone: 03-5985-4252
~~~~~~~INTERIOR DECORATIVE CONSTRUCTION CONTRACTOR~~~~~~~
Japanese blog
At this time, we thank you so much for browsing『Kikuchi Souken Co.,Ltd.』homepage.
Our company office is set up at Ikebukuro, Toshima ward, Tokyo, and we are an『Interior decorative construction contractor(company)』taking charge of full set of 『Interior decorative work』・『Original state recovery and restoration work』in all over Kanto district for you.
The construction site example which we are introducing and explaining this time is, the continuing of the last time.
We explained the entire decommission work operation last time.
The point of decommission work
The important point to execute decommission work is, it is indispensable to plan and evaluate adequately in advance, and receive an advice from experts.
In order to secure safety, it is necessary to consider to install appropriate safety equipment, to select instruments and tools・maintenance, and to minimize vibration and noise influence in the environment.
In addition, we also consider to treat waste and environmental influence, to correspond in an emergency, and securecommunication without fail.
to carry out to dispose waste, to consider the environmental influence, to correspond in emergency, and to secure communication without fail.
Finally, always prioritizing the site workers safety and trying best to strengthen to prevent accident and safety consciousness are required.
Then, we are explaining today’s content, which is regarding repair and restoration work.
Repair and restoration work
修繕・復旧工事とは、災害、事故、自然災害等で被災した建物、施設、インフラ、環境等を復旧し、復旧するために本来の機能や状態に戻す作業であると指摘されています。
Particularly, returning the suffered facility and environment to the original state, and making it to re-useable situation by repair, mending, reconstruction and other operation are included.
As for the purpose of repair and restoration work, early return from devastated living, returning infrastructure function, minimizing economic loss, and to protect environmental and cultural values, and so on are raised.
As the specific contents, repair and mending of building and facility damaged areas, repair and restoration of facility, recovery of road and bridge, reconstruction of public facility, and so on are included.
Besides, repair and restoration work is carried out, starting from urgent emergent measures, depending on the damaged degree, then throughout a series of process of decision of repair and restoration plan, material procurement, execution of work operation, up to completion test.
Repair and restoration work is highly complex depending on disaster stricken areas and state, so it often becomes an operation which may require much labor. However, by quick and appropriate execution, it will contribute life reconstruction to those who were stricken by disaster and society recovery.
Repair and restoration work this time is pointed to be a work of making a building and facility resulting from an accident of water leak, breakage and other reason damaged, to restore due to breakage reason, to restore to the original function and state.
Repair and restoration work due to building water leak is pointed to be, a work operation of evaluating its damaged reason and influence in detail, and doing appropriate repair and improvement firstly, then recovering building safety and function.
With above in mind, we are explaining the continuation of construction site example of decommission, repair and restoration work.
Construction site example
Site location: a whole floor of tenant building, Higashi-urawa, Midori ward, Saitama city, Saitama prefecture
Repair and restoration work contents:
We re-use the existing LGS (=light gauge steel) foundation as it is as much as possible and execute construction.
We execute foundation by LGS at repair and mending place, and newly making partition wall place.
Concurrently with LGS foundation work, we execute boards where we can use it at the existing place.
We stick on new Gyptone at the ceiling, and stick on gypsum board on the wall, then do putty treatment for sticking on so-called decorative cloth.
We stick on so-called decorative cloth for finishing, and newly spread vinyl chloride tile on the floor.
We confirm LGS foundation and the drawing.
After that, we move in the materials, and repair and improve LGS, then stick on boards.
Firstly, we start from sticking gypsum board on the wall.
We stick on Gyptone at the ceiling, and install electric light and so on.
We do putty treatment on the board, and do so-called decorative cloth sticking work.
Concurrently, we go on sticking vinyl chloride tile on the floor.
Summary
In this repair and restoration work construction site example, based on painstaking plan and careful procedure, we challenged to the repair and remending work.
By specialized technique and experience of『Kikuchi Souken Co.,Ltd.』, we certainly execute every step of repair and restoration work, so we are always striving to execute our construction to put our customer’s safety and satisfaction as the top priority.
Please continue to expect our effort of pursuing reliability and quality.
If you have any question or talk with us, please let us know about it light heartedly.
We certainly hope that『Kikuchi Souken Co.,Ltd.』are waiting to help you whole heartedly.
※Please understand that we will execute construction in Japan only.
As work expenses are greatly different according to contractors, so, we recommend you to get【plural competitive quotations】.
In the first place, after comparing each quotation, please consider to give us your order by all means.
From price quotation to construction work completion process, our company directly manage and execute all of construction work by ourselves. So, we are supplying「reasonable construction work as much as possible with high quality and good things」to our customers.
《Office・shop or store(tenant property)》renewal work・renovation decorative work・(reform work)・original state recovery and restoration construction・repair and improvement work(reform work)・original state recovery and restoration work, from partial repair and remedial work to full set of interior decorative work, we are glad to receive your order.
Please give us your relative inquiry light heartedly in the first place, as we are waiting for your contact whole heartedly.
We sometimes update SNS social media too.
We are waiting for your follow that it is good♡ too by all means.